We're hiring! From recent graduates to seasoned engineers and designers, grow your career at Inflo Design Group.
We're hiring! Join a team of water engineers making a real impact.
open positions

Program and construction management

Long Term Water Supply Program

A major capital program spanning more than a decade with the goal of securing a drought resilient, long-term water supply solution for Maury County.
IDG Water Engineering Project, Columbia Water Treatment Plant Improvements

IDG has served as Program Manager for CPWS’s $525M Long Term Water Supply Program since the program’s inception in 2016. The program addresses CPWS’s projected need for additional water supply and treatment capacity, driven by system demand growth and drought resilience requirements identified by the Duck River Agency. Major program components include a new 32 mgd Downstream Intake and Raw Water Pump Station on the Duck River located approximate 34 river miles downstream of the existing intake, approximately 17 miles of 36-inch Raw Water Transmission Main, and expansion of Columbia’s 20 mgd Water Treatment Plant to 32 MGD. IDG’s program management responsibilities include financial planning, funding assistance for a $272M WIFIA loan and a $135M SRF loan, program controls, procurement and contract management of design engineers and the Construction Manager at Risk, and owner’s representative services during construction which began in 2026.

Project Details
CLIENT
Columbia Power & Water Systems (CPWS)
LOCATION
Columbia, TN
SERVICES
Planning, Program Management, Planning, Conceptual Design, Design Procurement, CMAR Procurement, Funding Support, Financial Analysis, and Owner's Engineer during Construction
Project Value
$525M
Period
2016 – 2030